Exquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four Rings
Exquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four RingsExquisite Manual Butt Welding Machine Four Rings

Exquisite Manual Butt Welding Machine Four Rings

Short introduction

Exquisite Manual Butt Welding Machine Four Rings is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The most competitive wholesale price can provide regular size inventory and prompt delivery. For more information about Exquisite Manual Butt Welding Machine Four Rings, please contact us!

1. Welding range: 63mm-160mm, 63mm-200mm, 90mm-250mm

2. Application: PE, PB, PP and PVDF

3. Working voltage: 220V±10%

4. Planning tool: 0.68KW, heating plate: 1.6KW

Description

Exquisite Manual Butt Welding Machine Four Rings‌ is a manual operated welding machine specially designed for the butt welding of plastic pipes. This welding machine usually has four ring welding heads, so it is called four rings. It is suitable for welding thermoplastic pipes, such as PE pipes, and can be connected in two rings. The Exquisite Manual Butt Welding Machine Four Rings are designed to provide efficient and convenient welding solutions, especially for hydroelectric engineering, pipeline installation and other fields.

Function

The function of Exquisite Manual Butt Welding Machine Four Rings is mainly used for connecting PE, PP, PVDF pipes and fittings in the site, trench, and in the workshop. ‌ The collision welding machine is composed of a frame, a milling cutter, an independent heating plate, a milling cutter and a heating plate support, and has the following features and functions:

1.‌ Wide range of applications‌: Suitable for connecting PE, PP, PVDF pipes and fittings in construction sites and trenches, and can also be used in workshops to meet the needs of different working environments.

2. Simple structure: It is mainly composed of a frame, a milling cutter, an independent heating plate, and a bracket for the milling cutter and the heating plate. It has a simple structure, is compact and easy to use.

3. Advanced heating system: The heating plate adopts an independent temperature control system and a polytetrafluoroethylene surface coating to ensure temperature control and uniform heating during welding.

4. Easy operation: Single-person operation is suitable for use under complex working conditions, which improves the convenience and work efficiency of operation.

5. Excellent material: The main part of the frame is made of aluminum alloy, which is light and strong and suitable for long-term operation.

 

Exquisite Manual Butt Welding Machine Four Rings is designed with the actual use needs of construction sites and workshops in mind. Through its simple operation and efficient working performance, it provides a convenient solution for the connection of plastic pipes. Whether it is on-site or in workshop production, this welding machine can exert its efficient and stable working performance to meet the connection needs of various plastic pipes.

JUNNUO butt welding equipment is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The size ranges from 20mm-630mm. With Strong technical force, with senior engineers R & D team, using German technology, in strict accordance with the German electrical industry standards for manufacturing to provide customers with quality products.

 

JUNNUO can supply various butt welding equipment include: Socket welding fusion machine, electrofusion butt welding machine automatic hydraulic butt welding machine, hydraulic butt welding machine, manual butt welding machine, etc.

Specifications

Technical parameter

 

Manual Butt Welding Machine Four Rings 160

Includes basic frame, planing tool, heating plate and stand 

Fusion Range 

dia (mm):63 75 90 110 125 140 160

Butting Deviation

≤0.3mm

Package(mm) 

Wooden case 780X495X540

Temperature Deviation 

±3°C

G.W(KG). 

58.90

Operation Temperature

220°C

 

 

Weight(kg) 
 

Power(W) 
 

Ambient Temperature

-5- + 40°C

Heating Plate

 

3.10

1.6KW/220V

Required Time for Welding Temperature

< 20min

Planing tool 

 

6.40

0.68KW/220V

 

 

 

 

 

 

 

 

Applicable Material

PE, PP-R, PB, PVDF

 

Manual Butt Welding Machine Four Rings 200

Includes basic frame, planing tool, heating plate and stand

Fusion Range

dia (mm):63 75 90 110 125 140 160 180 200

Butting Deviation

≤0.3mm

Package(mm) 

Wooden case 790X530X560

Temperature Deviation 

±3°C

G.W(KG). 

66.60

Operation Temperature

220°C

 

 

Weight(kg)
 

Power(W)

Ambient Temperature

-5- + 40°C

Heating Plate

 

3.90

2.0KW/220V

Required Time for Welding Temperature

< 20min

Planing tool

 

7.50

0.68KW/220V

 

 

 

 

 

 

 

 

Applicable Material

PE, PP-R, PB, PVDF

 

Manual Butt Welding Machine Four Rings 250

Includes basic frame, planing tool, heating plate and stand 

Fusion Range

dia (mm):90 110 125 140 160 180 200 225 250

Butting Deviation

≤0.3mm

Package(mm) 

Wooden case 780X495X540

Temperature Deviation

±3°C

G.W(KG). 

102.10

Operation Temperature

220°C

 

 

Weight(kg) 
 

Power(W) 
 

Ambient Temperature 

-5- + 40°C

Heating Plate 

 

10.40

1.6KW/220V

Required Time for Welding Temperature 

< 20min

Planing tool 

 

7.20

0.68KW/220V

 

 

 

 

 

 

 

 

Applicable Material

PE, PP-R, PB, PVDF

Specifications subject to change will inform in time

Advantages

  • Suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation.
  • From the rack, cutter, heating plate and attachment bracket composition.
  • Manufactured by high-strength lightweight materials together.
  • Labor-saving, high work efficiency.
  • Machine's major components made by aluminum, than the foundry, steel lighter, firm, smooth.
  • Manual welding machine gear cover with a protective sleeve, this design makes the machine gear can not be wrapped in the soil on the site, and make the machine more robust.

 

Instructions:

JUNNUO Pipeline

1. Place the pipe to be welded on the frame and secure the pipe by locking the gland screw.
2. Place the planing tool on the frame, planer and mill the pipe mouth to ensure the smooth pipe end.
3. Take out the planing tool, planing and milling pipe to the center, ensure both ends in the same line.
4. Put in the preheated heating plate and shake the handle by hand to evenly heat the pipe end
5. Remove the heating plate, and connect the pipe end to the natural cooling, and ensure the cooling pressure.
6. After welding, check whether the welding beads are even and test the pressure.

INQUIRY