Short introduction
Hydraulic butt fusion welding machine is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The most competitive wholesale price can provide regular size inventory and prompt delivery. For more information about Hydraulic butt fusion welding machine, please contact us!
1. Welding range: 160mm-315mm
2. Application: PE, PB, PP and PVDF
3. Working voltage: 220V±10%
4. Planning tool: 1.1KW, heating plate: 2.8KW
JUNNUO butt welding equipment is suitable for PP, PB, PE, PVDF thermoplastic material of pipes and fittings in ditches or on site operation. The size ranges from 20mm-630mm. With Strong technical force, with senior engineers R & D team, using German technology, in strict accordance with the German electrical industry standards for manufacturing to provide customers with quality products.
JUNNUO can supply various butt welding equipment include: Socket welding fusion machine, electrofusion butt welding machine automatic hydraulic butt welding machine, hydraulic butt welding machine, manual butt welding machine, etc.
Technical parameter
Hydraulic butt fusion welding machine315 |
Includes basic frame, planing tool, heating plate, hydraulic unit, stand and trolly |
||
Fusion Range |
did (mm): 160180 200 225 250 280 315 |
Package(mm) |
|
Butting Deviation |
≤ 0.3mm |
Basic Frame |
Wooden Case 1010X665X 550 |
Temperature Deviation |
±3°C |
Hydraulic Unit |
Wooden Case 730X645 X 680 |
Total Section of Cylinders |
22.02CM² |
|
|
Heating plate Max Temperature |
299°C |
G.W. ( Total) |
189KG |
Operation Pressure Range |
0-4.5MPa |
Power(W) |
|
Applicable Material |
PE, PP-R, PB, PVDF |
Heating Plate |
2.8KW/220V |
Ambient Temperature |
-5- *40°C |
Planing Tool |
1.1KW/220V |
Required Time for Welding Temperature |
< 20min |
Hydraulic Unit |
0.75KW/220V |
|
|
Specifications subject to change will inform in time
Instructions:
1. Place the pipe to be welded on the frame and secure the pipe by locking the gland screw.
2. Place the planing tool on the frame, planer and mill the pipe mouth to ensure the smooth pipe end.
3. Take out the planing tool, planing and milling pipe to the center, ensure both ends in the same line.
4. Put in the preheated heating plate and shake the handle by hand to evenly heat the pipe end
5. Remove the heating plate, and connect the pipe end to the natural cooling, and ensure the cooling pressure.
6. After welding, check whether the flanges are even and test the pressure.